|
|
May 22, 2003
| Level 1 |
 |
 |
| To ready for the removal of floor tiles and construction and installation of compact shelving the entire floor has to be emptied. |
| Level 3 |
 |
 |
 |
 |
 |
 |
 |
 |
| To conform to a new layout, many ranges needed to be moved. Books were put in boxes until they could be re-shelved in another location on the floor. The shelves also needed to be dusted and adjusted after the move. |
| Photos by Chad Hopman. |
|